Up Connect4 » Panama » Panama Canal Transit Prev Next Slideshow

 Previous image  Next image  Index page
2011 04 08 008
2011 04 08 028
2011 04 08 043
2011 04 08 060
2011 04 08 078
  2011 04 08 081.JPG - Waiting for Spring Dragon to enter the second lock.  It was important to wait until the ship infront was in position and secured before we entered the lock as their prop activity caused alot of turbulance in the small confines of the lock.  Note the electric "Mule" trains that are used to position and hold the large ships in the locks.  
2011 04 09 006
2011 04 09 012
2011 04 09 017
2011 04 09 036
2011 04 09 053

Waiting for Spring Dragon to enter the second lock. It was important to wait until the ship infront was in position and secured before we entered the lock as their prop activity caused alot of turbulance in the small confines of the lock. Note the electric "Mule" trains that are used to position and hold the large ships in the locks. Download
Total images: 22 | Help